Why panel work and rewiring are planned together
Protection rules for any knob and tube that stays
If some knob-and-tube circuits stay after the panel changes, we size each breaker to that wire under the code in force when the permit is issued, and the inspector checks it. If insulation will surround those circuits, Washington requires breakers or Type S fuses rated for the old wire, and for the thin copper of that era that rating is often lower than owners expect.
New grounded circuits need somewhere to land
A rewire adds circuits for things the original house never had, such as kitchen counters, a bathroom and the laundry. Each gets its own line with a ground wire that has to be connected properly. We check every house to see whether the existing service can carry that and whether the panel has the spaces, and we don’t assume it needs a larger service.
Permits and inspection for Auburn addresses
Inside Auburn city limits, the permit and inspection for panel replacement and rewiring come from Washington L&I, not the City of Auburn. Some Auburn mailing addresses are actually in Federal Way, which issues its own electrical permits, so we check your street address first. We buy the permit before we start, and the inspection comes before anything is covered.
Changing service equipment can also mean a planned power shutoff, which we coordinate with the electric utility serving the house. You will know the plan before the day.
If you are staying in the house, the panel change is often the first step of room-by-room rewiring. For the full picture, see how we remove knob-and-tube.