Inspections between phases
Washington L&I requires inspection before electrical work is covered, and that applies to each phase: new cable in an open wall or ceiling is inspected before plaster patches or insulation go back. L&I issues the permits for addresses inside Auburn city limits; Federal Way addresses with an Auburn mailing address use that city’s own program.
Whether a phased job runs under one permit or several depends on the scope and timing, and we settle that with L&I before the first phase rather than guessing. You will know how many inspections to expect.
Living in the house during the work
Expect a few practical disruptions. Circuits in the active phase are off while they are replaced, so some outlets and lights will be out for part of the work. Fishing new cable through lath and plaster means small openings at outlets, switches and ceilings, and some plaster dust despite covers and cleanup.
Furniture near the work area needs to move, and access to the attic, basement or crawlspace has to stay clear. How long each phase takes depends on the circuits and access involved, so the schedule is agreed during scoping rather than promised in advance.
A phased rewire often begins with fuse box replacement so the new circuits have breaker spaces from the first phase. For an overview of knob-and-tube removal, see the Auburn Knob and Tube homepage.