Room-by-Room Rewiring in Auburn, Washington

Typical cost in Auburn

  • One room, such as a bedroom$2,500 – $6,500+
  • Two or three rooms, or one group of circuits$5,000 – $12,000+
  • One whole floor$8,000 – $18,000+
  • Whole house done in phases, about 1,200 to 2,000 sq ft$16,000 – $33,000+
  • 2026 state permit fee (L&I) for each phase, circuits only$79 – $110

You can keep living in the house while it is rewired. At Auburn Knob and Tube, we replace the knob-and-tube one room or circuit group at a time. It is still a complete replacement. We plan the phases from the start so the job ends with no live knob-and-tube left, rather than fixing a few circuits and stopping.

We also plan phased rewiring in Puyallup and Enumclaw, for houses where moving out for the duration is not realistic.

Request a free quote
Lath-and-plaster wall with small, neat access openings for fishing new wire

Ways to phase a rewire

By floor or circuit group

Old circuits seldom stop at a doorway. A single knob-and-tube run might feed two bedrooms and a hall light, so we draw the phases around circuits rather than room outlines. Working a floor at a time, or one attic or crawlspace route at a time, often lets one access path serve several rooms.

Around kitchens, bathrooms and bedrooms in daily use

The order follows how you use the house. Many households want the kitchen and bathroom circuits done early, since that is where appliances and moisture are. Others start with the bedrooms so the sleeping spaces are settled first. We decide what stays powered during each phase and keep any temporary setup within code.

Keeping a record of what has been replaced

Phased work only stays safe if everyone knows which circuits are new and which are still original. After every phase we give you an updated circuit map and panel directory, so no forgotten knob-and-tube run stays energized when the next phase starts or after the last one.

Inspections between phases

Washington requires an inspection before electrical work is covered, and that applies to every phase. New cable in an open wall or ceiling is inspected before plaster patches or insulation go back. L&I issues the permits for addresses inside Auburn city limits. Federal Way addresses with an Auburn mailing address use that city’s own program.

Whether a phased job runs under one permit or several depends on how the work is split up and timed. We settle that with L&I before the first phase, so you know how many inspections to expect.

Living in the house during the work

Expect a few disruptions. The circuits we are working on are off while we replace them, so some outlets and lights will be out for part of the job. We fish new cable through lath and plaster, which means small openings at outlets, switches and ceilings, and some plaster dust even with covers and cleanup.

Furniture near the work area needs to move, and the way into the attic, basement or crawlspace has to stay clear. How long each phase takes depends on the circuits and access involved, so we agree on the schedule when we plan the job, rather than promising one up front.

Empty upstairs room in an older house with plaster walls, a ceiling access hatch and folded drop cloths

Frequently asked questions

Can you rewire one room at a time?

Often, once we have mapped the circuits. Where a circuit spans several rooms, the phase follows the circuit, which may mean two or three rooms together.

How long does one room take?

It depends on how many circuits feed the room, whether we can reach it from the attic or crawlspace above or below, and what the walls and ceilings are made of. We set the schedule for each phase when we plan the job.

Is room-by-room rewiring the same as partial rewiring?

No. Partial rewiring replaces only some circuits and may leave knob-and-tube in service. Room-by-room rewiring is a whole-house replacement split into phases, and it ends when every original circuit has been replaced or disconnected.

Who repairs the plaster openings?

We agree on that when we plan the job. Some owners hire a plasterer or painter after the final inspection, and others ask us to arrange the patching with the work. Either way, we keep the openings as small as the wiring route allows.

We often begin a phased rewire with the fuse box replacement, so the new circuits have breaker spaces from the first phase. Want the whole job start to finish? Read about knob-and-tube removal.

Request a free knob and tube quote

Let us know which rooms need to stay usable, roughly when the house was built and whether we can get in from the attic or crawlspace. Add the street address so we can confirm which office issues the permit. We'll get back to you soon with an estimate or any questions we have. Estimates are free and there's no obligation.